Demos
This demo shows how FormSync builds protocol amendments in a linked, non-live replica created from the study designer so teams can test amended forms with test participants without touching production data. It covers reviewing changes using green, red, and yellow color cues for added, deleted, and modified items. Finally, it demonstrates taking a study backup as a rollback point before accepting and merging the reviewed change set into the live production study with no downtime.
The recording plays after the short form below.
A protocol amendment lands while sites are still enrolling, so a design change usually means editing the live study in your electronic data capture system. See how FormSync builds that change in a linked, non-live replica of your production study, lets your team test it with test participants, then merges a reviewed change set into production with no downtime.
Build the amendment somewhere safe, not on live production data. See a reviewed change set merge into production with a rollback point in place.
Watch the demo now →
Discover all the features offered by Castor EDC
Discover Now